Clean room renovation process

Published on.

2022-08-24 14:25

Cleanroom renovation process is divided into the following six major parts

A. Determine the program and quotation, sign a contract is generally the first to see the site, many programs are required according to the site, and the workshop production product design. Different industry requirements are different, the level is different, the price is also different. Need to tell the designer clean room decoration level, area, ceiling and under the beam, - good to have drawings. Convenient later design, but also to reduce the time. Program price is determined after signing a contract to start construction.

Second, the color steel plate partition installation equivalent to the general framework, the material into the field will be all the partition wall well, time according to the plant area to determine. Cleanroom decoration belongs to the industrial plant, generally faster, unlike the decoration industry, the construction period is slow.

Third, the ceiling ceiling needs to be installed after the installation of the partition, which should not be ignored. The ceiling will be installed equipment, such as FFU filters, purification lights, air conditioning, etc.. Suspension screws, plate distance should be in accordance with the provisions. Reasonable layout, so as not to have unnecessary trouble later.

Fourth, equipment and air conditioning installation Cleanroom purification industry main equipment contains: FFU filter, purification lamp, air outlet, air shower room, air conditioning, etc.. The equipment is generally slightly slower and needs time to produce spray paint. Therefore, after signing the contract, pay attention to the equipment in time. To this step, the workshop installation is basically completed, the next step is the ground engineering.

V. Ground engineering What ground is suitable for what flooring paint. What to pay attention to during the construction season of floor paint, how the temperature and humidity, and how long you can enter after the construction is completed. It is recommended that the owner check first. 

Sixth, acceptance Check whether the partition wall material is intact. Whether the workshop is up to the level. Whether the equipment in each area can operate normally, etc. This is probably such a process.

Clean room uses the function of many equipments to create a clean and tidy occasion, which is indispensable for our modern food industry, industry, electronic processing industry, etc. The people working in the clean room are required to comply with certain standards, which must be observed in order to maintain the cleanliness of the workshop.
 