Project Description
Xinyi Glass Cleanroom Renovation work
Project Name:Xinyi Glass Holdings Limited
Project content:10,000 class purification project
Industry Category:Auto glass, architectural glass, photovoltaic glass manufacturing
■ Introduction of Xinyi Glass
Founded in 1988 and listed on the Main Board of the Hong Kong Stock Exchange in February 2005, Xinyi Glass Holdings Limited is one of the major manufacturers in the global glass industry chain.
■ Key Notes:
1、 Injection molding industry
1-1, according to the characteristics of the injection molding industry, the design focuses on the injection molding area, the calculation of air conditioning cooling capacity needs to consider the heat of the injection molding machine, otherwise the summer cooling temperature is difficult to come down.
1-2, because of the injection molding machine heat generation, in the spring, autumn, and even into the winter season air conditioning need cooling mode, and other workshop operation mode (winter heating), the design needs to be carefully considered!
1-3, injection molding machine head work area, the work will produce odor gas, the design needs to consider local strong exhaust to remove odor gas, to avoid causing human injury.
2、 Painting industry
2-1、According to the characteristics of the painting industry, the design focuses on the spraying area and baking area.
2-2, the spraying area has high requirements for dust, and the general local design of the spraying area should reach 1000 or 100 levels, so as to ensure the finish of the products. The exhaust air of the paint spraying area must be set independently and must be discharged by the exhaust gas treatment equipment to meet the environmental protection requirements.
2-3, spray paint area shall be designed with negative pressure (relative to adjacent clean area)
2-4, baking area oven door open will generate a lot of heat, local need to design the corresponding exhaust air to drain away the heat generated.
3、Clean room air cleanliness level table
Air cleanliness class (N) | Greater than or equal to the maximum concentration limit of the required particle size (pc/m³) | |||||
0.1μm | 0.2μm | 0.3μm | 0.5μm | 1μm | 5μm | |
1 | 10 | 2 | -- | -- | -- | -- |
2 | 100 | 24 | 10 | 4 | -- | -- |
3 | 1000 | 237 | 102 | 35 | 8 | -- |
4 | 10000 | 2370 | 1020 | 352 | 83 | -- |
5 | 100000 | 23700 | 10200 | 3520 | 832 | 29 |
6 | 1000000 | 237000 | 102000 | 35200 | 8320 | 293 |
7 | -- | -- | -- | 352000 | 83200 | 29300 |
8 | -- | -- | -- | 3520000 | 832000 | 29300 |
9 | -- | -- | -- | 35200000 | 8320000 | 293000 |
Choose us Five advantages

Focus on food and drug, electronic industry clean room one-stop solution 18years since the establishment of a professional safety management system
18 years industry experience
1、18 years industry experience
◆ 18 years of precipitation
◆ 200 successful cases
◆ Repeat customers and word-of-mouth customers account for a high percentage
◆ Increasing number of well-known corporate clients


Construction Level 2 Qualified Enterprise
2、Construction Level 2 Qualified Enterprise
◆ Decoration Level 2 Qualification, Mechanical and Electrical Level 3 Qualification, General Contractor of Construction Level 3 Qualification
◆ Have a safety production license
◆ Self-built professional safety management system
◆ Zero major safety accidents since 18 years
3、60 technicians of all kinds
60 technicians of all kinds
◆ We can design and build high level GMP workshop class A and class 1 clean room
◆ Tailor-made design solutions
◆ Project design are strictly implement GB50073-2013\GB 50473-2008\GB50457- 2008 and other national standard clean specification and the United States federal 209E standard


Third party acceptance test verification
4、Third party acceptance test verification
◆ Self-provided full set of testing instruments, first self-test after third-party testing
◆ The project construction strictly implements national GMP, US FDA and EU Euro GMP and other domestic international standards.
Customer Focused
5、Customer Focused
◆ Complete standardized process to ensure the construction period and quality
◆ One year after the warranty period, take the initiative to visit 2 times and 1 time at home
◆ We are convinced that our work is only valuable if the users are satisfied.