Purification project
热门关键字:食品净化车间 医药洁净车间 低温车间 洁净室 无尘洁净室
Precision parts purification project for automobile engine - Penta
Category:
Project Description
Penta Cleanroom Renovation work
Project Name:Penta Automotive Precision Parts (Shanghai) Co.
Project content:10,000 class purification project
Industry Category:Piston cooling nozzles and other precision parts for automotive engines decontamination project
■ Introduction of Penta
Penta Automotive Precision Parts (Shanghai) Co. is a French-owned company headquartered in the Alps region, and is one of the largest European manufacturers specializing in the design of piston cooling nozzles and other precision parts for automotive engines. The company has subsidiaries in the Czech Republic, Brazil, USA and China. Ltd. products have been widely used in VW,AUDI,GM,PEUGEOT,CITROEN,HYUNDAI,TOYOTA,BMW…… the company pays great attention to the development of staff competence.
Clean room with constant temperature and humidity system, clean class 10,000, built by Shanghai Tobetter.
■ Key Notes:
1、People flow
1-1、Personnel purification:
1-2, clean room entrance should be set up air blowing shower room. When there is no air blowing shower room, there should be an airlock room.
1-3, single person air blowing shower room, should be set up a maximum class size of 30 people. Clean room personnel more than 5 people, air blowing shower room side should have a one-way bypass door.
1-4, air blowing shower room into and out of the door shall not be opened at the same time, should take chain control measures.
1-5, air cleanliness level 5 or strict than 5 vertical unidirectional flow clean room, it is appropriate to set up airlock room.
2、Logistics
2-1, clean room equipment and material entrances and exits, should be set up independently, and should be set up according to the characteristics of equipment and materials, nature, shape, etc. purification with room and the corresponding material clean facilities.
2-2, material purification with room and clean room should be set up between the airlock room or transfer window.
3、Differential static pressure
3-1, the static pressure difference between clean rooms of different levels should be greater than or equal to 5 Pa.
3-2, the static pressure difference between the clean room and the non-clean room should be greater than 5 Pa.
3-3、The static pressure difference between clean room and outdoor should be more than 10Pa.
4、Clean room air cleanliness level table
Air cleanliness class (N) | Greater than or equal to the maximum concentration limit of the required particle size (pc/m³) | |||||
0.1μm | 0.2μm | 0.3μm | 0.5μm | 1μm | 5μm | |
1 | 10 | 2 | -- | -- | -- | -- |
2 | 100 | 24 | 10 | 4 | -- | -- |
3 | 1000 | 237 | 102 | 35 | 8 | -- |
4 | 10000 | 2370 | 1020 | 352 | 83 | -- |
5 | 100000 | 23700 | 10200 | 3520 | 832 | 29 |
6 | 1000000 | 237000 | 102000 | 35200 | 8320 | 293 |
7 | -- | -- | -- | 352000 | 83200 | 29300 |
8 | -- | -- | -- | 3520000 | 832000 | 29300 |
9 | -- | -- | -- | 35200000 | 8320000 | 293000 |
Note: According to different measurement methods, the effective digits of the concentration data of each level should not exceed 3 digits.
Choose us Five advantages

Focus on food and drug, electronic industry clean room one-stop solution 18years since the establishment of a professional safety management system
18 years industry experience
1、18 years industry experience
◆ 18 years of precipitation
◆ 200 successful cases
◆ Repeat customers and word-of-mouth customers account for a high percentage
◆ Increasing number of well-known corporate clients


Construction Level 2 Qualified Enterprise
2、Construction Level 2 Qualified Enterprise
◆ Decoration Level 2 Qualification, Mechanical and Electrical Level 3 Qualification, General Contractor of Construction Level 3 Qualification
◆ Have a safety production license
◆ Self-built professional safety management system
◆ Zero major safety accidents since 18 years
3、60 technicians of all kinds
60 technicians of all kinds
◆ We can design and build high level GMP workshop class A and class 1 clean room
◆ Tailor-made design solutions
◆ Project design are strictly implement GB50073-2013\GB 50473-2008\GB50457- 2008 and other national standard clean specification and the United States federal 209E standard


Third party acceptance test verification
4、Third party acceptance test verification
◆ Self-provided full set of testing instruments, first self-test after third-party testing
◆ The project construction strictly implements national GMP, US FDA and EU Euro GMP and other domestic international standards.
Customer Focused
5、Customer Focused
◆ Complete standardized process to ensure the construction period and quality
◆ One year after the warranty period, take the initiative to visit 2 times and 1 time at home
◆ We are convinced that our work is only valuable if the users are satisfied.