Project Description
Aguan Cleanroom Renovation work
Project Name:Shanghai Aguan Semiconductor Technology Co.
Project content:100,000 class purification project
Industry Category:Precision electronic purification project
■ Introduction to Aguan
Shanghai Aguan Semiconductor Technology Co., Ltd. is located in Shanghai, mainly engaged in the processing of semiconductor equipment parts, repair, semiconductor technology development, technical services in the field of technology, Shanghai Aguan Semiconductor Technology Co. To achieve value maximization, return to the community; to integrity and dedication as the corporate mission, in Shanghai gradually established a good brand of the company.
■ Engineering construction matters:
1. Partition wall
(1) The material of the partition wall is: 50mmt handmade rock wool color steel plate, the thickness of the color steel plate is 0.476mm.
(2) The building envelope and interior decoration of the clean plant shall take reliable air tightness treatment. The gap between the board and the board is 2-3mm, and must be played with neutral environmental protection silica gel.
(3) The surface of the wall in the clean room is flat, smooth, dust-free, avoiding glare, and easy to dust.
2. Ceiling
The material of the ceiling is: 50mmt handmade rock wool color steel plate, the thickness of the color steel plate is 0.476mm, the height of the ceiling is 4.5m.
3. Doors and windows
(1) The location of the doors and windows should be opened on the whole board, except for those indicated.
(2) Doors and windows are made of aluminum alloy, and doors make colorful steel plate doors; windows use transparent glass.
(3) The installation height of the viewport depends on the actual situation on site.
(4) All doors and windows ensure that specifications and quantities are carefully checked before ordering.
4. Other:
4.1. Except as indicated in the drawings, the rest are in accordance with the requirements of "Clean Room Construction and Acceptance Specification" GB50591-2010.
4.2. When installing pipeline, there are more pre-buried parts and openings, the color steel plate installation should cooperate with HVAC, weak electricity and other professional construction and installation personnel, and ensure the correct position and size of pre-buried parts and openings as required by relevant professional drawings to ensure the comprehensive quality of the project.
4.3. During the installation of the color steel plate, the maintenance channel needs to be set up to facilitate the work of relevant professional maintenance.
Choose us Five advantages

Focus on food and drug, electronic industry clean room one-stop solution 18years since the establishment of a professional safety management system
18 years industry experience
1、18 years industry experience
◆ 18 years of precipitation
◆ 200 successful cases
◆ Repeat customers and word-of-mouth customers account for a high percentage
◆ Increasing number of well-known corporate clients


Construction Level 2 Qualified Enterprise
2、Construction Level 2 Qualified Enterprise
◆ Decoration Level 2 Qualification, Mechanical and Electrical Level 3 Qualification, General Contractor of Construction Level 3 Qualification
◆ Have a safety production license
◆ Self-built professional safety management system
◆ Zero major safety accidents since 18 years
3、60 technicians of all kinds
60 technicians of all kinds
◆ We can design and build high level GMP workshop class A and class 1 clean room
◆ Tailor-made design solutions
◆ Project design are strictly implement GB50073-2013\GB 50473-2008\GB50457- 2008 and other national standard clean specification and the United States federal 209E standard


Third party acceptance test verification
4、Third party acceptance test verification
◆ Self-provided full set of testing instruments, first self-test after third-party testing
◆ The project construction strictly implements national GMP, US FDA and EU Euro GMP and other domestic international standards.
Customer Focused
5、Customer Focused
◆ Complete standardized process to ensure the construction period and quality
◆ One year after the warranty period, take the initiative to visit 2 times and 1 time at home
◆ We are convinced that our work is only valuable if the users are satisfied.