Purification project
热门关键字:食品净化车间 医药洁净车间 低温车间 洁净室 无尘洁净室
Fresh Food Cold Chain Workshop-Jianong (awarded "Most Influential Banana Brand")
Category:
Project Description
Good FarmFresh food cold chain purification workshopInstallation
Project Name:Good Farm
Project content:100,000 class purification project
Industry Category:Fresh food cold chain workshop
■Canon Introduction
Started in 2002 and headquartered in Shanghai, China, Food Cold Services is a quality enterprise in the fresh food supply chain service industry in China. We provide comprehensive fresh food supply chain services including cross-border direct sourcing, commercialized processing, fresh storage, cold chain logistics and distribution, and sales services for domestic and foreign customers.
Our brand has leading influence in the industry, and in 2018, we won the “Most Influential Brand Enterprise” issued by China Fruit Distribution Association, and the “Goodfarmer” brand won the “Most Influential Banana Brand”.
Our products are diversified and rich, forming an import and export business of fruits and vegetables with bananas as the main product, and an emerging business with meat, seafood and casual food as the main products, and distributing famous brands such as New Zealand Jiapai Kiwi, New Zealand Fonterra Group Anjia, Anyi and Amman.
With our global sales network, we have long-term relationships with customers in hundreds of countries and regions. Our domestic customers cover large supermarkets, e-commerce, fruit chain stores, new retail systems and large wholesalers.
Our global direct sourcing network covers the main production areas of bananas, pineapples and other fruits that meet international quality standards outside of China, and our domestic sourcing network covers the high quality main production areas of garlic, apples and other fruits and vegetables.
Our national warehousing and cold chain logistics network has established 24 distribution centers in major cities, with 32,000 square meters of fresh storage and 13,000 square meters of ripening storage, with a capacity of 290 containers of bananas ripening per week. With each city distribution center as a key node, we have established a full cold chain logistics network with cross-country shipping routes, domestic logistics trunk lines and intra-city distribution networks.
Warmly congratulate Shanghai Lixin and JiaNong Food signed a contract in Shanghai in 2018, Shanghai Lixin protects your clean system stable operation for 15 years.
■ Cleanroom clean room project completion acceptance of the commissioning of the preparatory work before
1, the clean room purification project commissioning organization preparation:
The commissioning team headed by the construction unit (owner) with the participation of design unit, construction unit and supervision unit personnel is established. The commissioning team leads the overall work of commissioning, the commissioning team coordinates the relationship between all parties, and the commissioning team provides various soft and hard conditions for the commissioning work.
2、Commissioning outline of clean room purification project preparation
Under the leadership and organization of the commissioning team, the commissioning outline is prepared. Commissioning outline is the guiding document of commissioning work. The content of the commissioning outline includes: organizational division of labor, material mobilization; commissioning project, commissioning method, commissioning instrument; commissioning procedure, commissioning progress, commissioning plan arrangement, etc. The preparation of the commissioning outline makes the commissioning personnel clear in mind, unified in understanding, consistent in pace and neat in action, so that the commissioning work is carried out smoothly.
3、The quality of the clean room construction site will be checked
Under the leadership organization of the commissioning team, relevant leaders and technical personnel of construction unit, design unit, construction unit and supervision unit participated in the construction site and construction quality for a comprehensive meeting inspection. From the refrigeration station, heat exchange station, boiler room, substation and distribution station, air-conditioning machine room to the cooling, heating, power supply system, air-conditioning purification system and automatic control system. From the construction quality of equipment (freezers, boilers, pumps, cooling towers, air conditioners, etc.), fittings (valves, air outlets, mufflers, etc.), pipes and pipelines to insulation, equipment foundations, pipe supports and hangers, etc. will be fully inspected. To see whether the construction according to the map, check and design drawings do not match the place, to find the construction quality of unqualified items and check the reasons. And the construction, processing, installation and other quality issues one by one to fill out “ defect schedule ”, put forward rectification advice, the deadline (before the official commissioning) rectification completed.
4、Clean room purification project of the air conditioning equipment, air conditioning system cleaning:
① It is very necessary to carry out a comprehensive and thorough cleaning of the clean room before commissioning. The ground, wall, ceiling, doors and windows of the clean room should be carefully, comprehensively and thoroughly cleaned (it is better to ask professional cleaning company); the air conditioning equipment, air conditioning ducts (air supply duct, air return duct, new air duct), air conditioning accessories (cleaners, valves, air outlets, etc.) should be checked, leak detection and wipe test. Until the clean requirements are met.
②Install coarse and medium-effect filters for the first air blowing. On the basis of thorough cleaning, install the coarse and middle-effect filters in the air conditioner. Air-blowing of the whole purified air conditioning system, air-blowing time is 24~36 hours, so that the whole system can be initially purified.
③Installation of high efficiency filter. High efficiency filter can be installed after the system is air blown. Before the installation of high-efficiency filters, it is required to leak detection one by one, and plugging for those with leaks. Leak detection is carried out on the temporary leak detection table, and the dust source uses atmospheric dust. The high efficiency filters that are qualified can only be installed, and after installation, the installation seal of the high efficiency filters will be tested again for leaks (using dust particle counter scanning) to achieve qualified installation.
④High efficiency filter installation leak detection after passing the second air blowing on the purified air conditioning system. The air blowing time is 24 hours, and then the commissioning procedure can be carried out.
5, clean room purification project test instruments, meters, tools for the preparation
① The instrumentation used in the commissioning should be debugged and calibrated before the commissioning (over the use of time also need to be re-calibrated). The instruments used include instruments for measuring air speed, air volume, temperature, relative humidity, differential pressure, noise, vibration, rpm, time, atmospheric pressure and cleanliness, etc.
② debugging equipment and tools used in the preparation. Such as: electrician's tools, plumber's tools, metalworker's tools, pliers' tools and ladders for climbing up and down. And ask the construction unit to cooperate with electricians, plumbers, metalworkers and pliers.
③ Preparation of drawings and record forms used for commissioning and testing work.
Choose us Five advantages

Focus on food and drug, electronic industry clean room one-stop solution 18years since the establishment of a professional safety management system
18 years industry experience
1、18 years industry experience
◆ 18 years of precipitation
◆ 200 successful cases
◆ Repeat customers and word-of-mouth customers account for a high percentage
◆ Increasing number of well-known corporate clients


Construction Level 2 Qualified Enterprise
2、Construction Level 2 Qualified Enterprise
◆ Decoration Level 2 Qualification, Mechanical and Electrical Level 3 Qualification, General Contractor of Construction Level 3 Qualification
◆ Have a safety production license
◆ Self-built professional safety management system
◆ Zero major safety accidents since 18 years
3、60 technicians of all kinds
60 technicians of all kinds
◆ We can design and build high level GMP workshop class A and class 1 clean room
◆ Tailor-made design solutions
◆ Project design are strictly implement GB50073-2013\GB 50473-2008\GB50457- 2008 and other national standard clean specification and the United States federal 209E standard


Third party acceptance test verification
4、Third party acceptance test verification
◆ Self-provided full set of testing instruments, first self-test after third-party testing
◆ The project construction strictly implements national GMP, US FDA and EU Euro GMP and other domestic international standards.
Customer Focused
5、Customer Focused
◆ Complete standardized process to ensure the construction period and quality
◆ One year after the warranty period, take the initiative to visit 2 times and 1 time at home
◆ We are convinced that our work is only valuable if the users are satisfied.
